Bulk Material Calculator - Volume and Weight

Cubic Yard Calculator

Convert project dimensions into cubic feet, cubic yards, tons, and cost.

Reviewed: September 24, 2026. Editorial update: September 30, 2026

Calculate bulk material

Enter the finished project dimensions. The calculator converts volume to cubic yards, applies the optional allowance once, and uses the editable supplier density to estimate short tons.

Density is used only for the optional weight conversion. Match it to the installed volume calculated from the entered depth; a loose delivered density needs a documented yield conversion before use. The displayed value is a planning starting point.

One cubic-yard landscape gravel delivery beside a measured garden bed

Formula used

Cubic yards = [length × width × (depth ÷ 12) ÷ 27] × (1 + waste ÷ 100); tons = cubic yards × density

Reference basis: fixed unit conversions follow the NIST SI conversion tables. Bulk density is product- and condition-specific; the FHWA Field Materials Manual documents aggregate sampling and moisture-density testing; supplier or project data for the actual product and condition should replace the planning preset when available. The USGS aggregates program is used for aggregate terminology and scope. Read the full methodology and limitations.

Worked bulk material example

Example values: 24 ft × 10 ft × (4 in ÷ 12) ÷ 27 = 2.96 yd³ measured volume. With 0% allowance, the order volume is 2.96 yd³. At 1.4 short tons/yd³, the estimated weight is 4.15 short tons. These are examples only; use project measurements and supplier data.

Volume, density, and supplier units

Use cubic yards for volume-based orders and the density-derived tonnage only after replacing the default with the exact material's bulk density.

Field conditions that change tonnage

Excavation irregularity, settlement, compaction, moisture, and supplier density affect weight and delivered volume.

Questions specific to this calculation

Which bulk density belongs in the cubic yard tons estimate?

Use product-specific bulk density in short tons per cubic yard for the same installed state as the volume calculated from your dimensions. Density changes the tonnage estimate, not the geometric cubic yards. A loose-delivered density cannot be multiplied directly by an installed volume without a documented yield conversion; this tool does not apply that conversion.